Bumper Savings With Powerplay
Calculate How Much You Can Save Using Powerplay
Number of sites
10
Site
1
100
Average Construction Volume
X
Cr
1 Cr
100 Cr
Total Cost:
₹
60.00 Cr
Savings:
₹
3.00 Cr
Material:
₹
1.
XXX
Labor:
₹
60
XXX
Collaboration :
₹
60
XXX
Fill details to know the breakup
Breakup of Saving
Material :
₹
Labor :
₹
Collabration :
₹
Saved on Material
- Prevent Theft and Wastage with Accurate Tracking
- Effortlessly Manage Inventory
Saved on Labour
- Track daily attendance accurately
- Clarify wages and overtime to avoid confusion
Saved on Collaboration
- Minimize Errors and Time with Automated Report Making
- Stay Updated with Real-Time Notifications