Bumper Savings With Powerplay

Calculate How Much You Can Save Using Powerplay

Number of sites

10

Site

1

100

Average Construction Volume

X

Cr

1 Cr

100 Cr

Total Cost:

₹

60.00 Cr

Savings:

₹

3.00 Cr

Material:

₹

1.

XXX

Labor:

₹

60

XXX

Collaboration :

₹

60

XXX

Fill details to know the breakup

Breakup of Saving

Material :

₹

Labor :

₹

Collabration :

₹

Saved on Material

  • Prevent Theft and Wastage with Accurate 
Tracking
  • Effortlessly Manage Inventory

Saved on Labour

  • Track daily attendance accurately
  • Clarify wages and overtime to avoid confusion

Saved on Collaboration

  • Minimize Errors and Time with Automated Report Making
  • Stay Updated with Real-Time Notifications